Critical Workforce Competencies for Accelerating Industrialised Building System Implementation in Dilapidated Rural School Reconstruction: Evidence from Sarawak, Malaysia
Authors
Wan Fadillah Bin Wan Ahmad
DBA Candidate, Faculty of Business, UNITAR International University, Malaysia (MY)
Article Information
DOI: 10.51583/IJLTEMAS.2026.150400085
Subject Category: Managemant
Volume/Issue: 15/4 | Page No: 944-970
Publication Timeline
Submitted: 2026-05-12
Published: 2026-05-12
Abstract
Purpose: This study identifies critical workforce competencies required to accelerate Industrialised Building System (IBS) implementation in dilapidated rural school reconstruction projects in Sarawak, Malaysia, addressing a critical gap in educational infrastructure development.
Design/Methodology/Approach: A comprehensive systematic review of 30 peer-reviewed studies was conducted, examining IBS implementation challenges, workforce competency requirements, and contextual factors specific to rural construction in Malaysia. Evidence was synthesized to develop a multi-tiered competency framework encompassing technical, managerial, digital, and context-specific capabilities.
Findings: Successful IBS-based rural school reconstruction requires four critical competency domains: (1) technical competencies including prefabricated component handling, precision assembly, and quality control; (2) managerial competencies encompassing project coordination, supply chain management, and stakeholder engagement; (3) digital competencies involving Building Information Modeling (BIM), digital fabrication, and data-driven decision-making; and (4) context-specific competencies addressing rural logistics, local material integration, and community engagement. Major barriers include limited IBS knowledge among Sarawak contractors (78% reporting insufficient awareness), critical shortages of skilled installers, inadequate training infrastructure, and logistical challenges in remote areas.
Research Limitations/Implications: The study is based on available literature and may not capture all emerging competency requirements. Future empirical research should validate the framework through field studies in active reconstruction projects.
Practical Implications: The competency framework provides actionable guidance for government agencies, educational institutions, and construction firms to develop targeted training programs, establish industry-academia partnerships, and implement policy interventions that build sustainable local capacity for IBS-based school reconstruction.
Originality/Value: This is the first comprehensive study to systematically identify workforce competencies specifically for IBS implementation in Sarawak rural school reconstruction, addressing the unique intersection of industrialized construction, educational infrastructure, and rural development contexts in Malaysia.
Keywords
Industrialised Building System; IBS; workforce competencies; rural school reconstruction; construction education; Sarawak; prefabricated construction; infrastructure development; skill development; construction workforce
This article is licensed under a Creative Commons Attribution 4.0 International License (CC BY 4.0).
Downloads
References
1. A Mohsen, R Yunus, R Handan, Kasim, N., & Hussain, K. (2018). Determining factors for enhanced skilled worker requirements in IBS construction projects in Malaysia. The 3rd International Symposium on Expertise of Engineering Design (ISEED). 220. IOP Conference Series: Earth and Environmental Science. doi:10.1088/1755-1315/220/1/012048 [Google Scholar] [Crossref]
2. A. A. M. Bohari, Mahat, N., & K. Kipli. (2012). Industrialised Building System (IBS) in Sarawak construction industry. International Conference on Innovation Management and Technology Research, 433-437. doi:10.1109/ICIMTR.2012.6236433 [Google Scholar] [Crossref]
3. Abas, A., Hanafi, M. H., & Aswad Ibrahin, F. (2013). Competencies Factors of Malaysian Architectural Firms Towards the Implementation of Industrialized Building System. Middle East Journal of Scientific Research. doi:10.5829/idosi.mejsr.2013.18.8.12471 [Google Scholar] [Crossref]
4. Abd Rahman, A. B., & Omar, W. (2006). Issues and challenges in the implementation of Industrialised Building Systems in Malaysia. Asia-Pacific Structural Engineering and Construction Conference (APSEC2006). Kuala Lumpur. [Google Scholar] [Crossref]
5. Abdullah, M., & Egbu, C. (2010). The Role of Knowledge Management in Improving the Adoption and Implementation Practices of Industrialised Building System (IBS) in Malaysia. Retrieved from https://salford-repository.worktribe.com/output/1455534/the-role-of-knowledge-management-in-improving-the-adoption-and-implementation-practices-of-industrialised-building-system-ibs-in-malaysia [Google Scholar] [Crossref]
6. Alawag, A., Alaloul, W., Liew, M., Al-Bared, M., Zawawi, N., & Ammad, S. (2021). The Implementation of the Industrialized Building System in the Malaysian Construction Industry: A Comprehensive Review. Proceedings of the 3rd International Conference on Separation Technology. doi:10.1007/978-981-16-0742-4_1 [Google Scholar] [Crossref]
7. asmah alia, m. b., Kumalasari, K., & Noorsaidi, M. (2012). Industrialised Building System (IBS) in Sarawak Construction Industry. Innovation Management and Technology Research (ICIMTR. [Google Scholar] [Crossref]
8. Bohari, A. A., Mahat, N., & Kipli, K. (2011). Contractor’s Knowledge on Industrial Building System (IBS) in Sarawak. Conference: ASEAN Conference on Scientific and Social Science Research 2011. [Google Scholar] [Crossref]
9. Buyung, N., & Ghani, A. A. (2014). The State of Skilled Components Installers for Industrialized Building System (IBS) Construction in Malaysia. Building Surveying and Technology Undergraduate Conference. 10. EDP Sciences, 2014. doi:10.1051/matecconf/20141004002 [Google Scholar] [Crossref]
10. F. Md Razak, & Awang, H. (2014). The Contractors’ Perception of the Implementation of Industrialised Building System (IBS) in Malaysia. 10. EDP Sciences, 2014. Retrieved from https://doi.org/10.1051/matecconf/20141004003 [Google Scholar] [Crossref]
11. Farah Deba, A. A., Farah Nora Aznieta, A. A., Salihuddin, H., & Mohd Saleh, J. (2016). A Review on Industrialised Building System Issues in Malaysia. In 0. (. MATEC Web of Conferences 47 (Ed.), The 3rd International Conference on Civil and Environmental Engineering for Sustainability (IConCEES 2015). EDP Sciences, 2016. Retrieved from https://doi.org/10.1051/matecconf/20164704019 [Google Scholar] [Crossref]
12. Gin, L. J., Ilham, S., & Arputhan, S. (2021). APPROPRIATE STRATEGIC MANAGEMENT APPROACHES FOR ENHANCING PROJECT PERFORMANCE THROUGH THE ADOPTION OF THE INDUSTRIALIZED BUILDING SYSTEM IN THE MALAYSIAN CONSTRUCTION SECTOR. Researchers World - International Refereed Social Sciences Journal, 7(4(1)), 01-07. Retrieved from https://www.researchersworld.com/index.php/rworld/article/view/508 [Google Scholar] [Crossref]
13. Hadi, N. A., Muhamad, W. M., & Othman, M. K. (Eds.). (2017). Critical factors of implementing Industrialised Building System in Sarawak: A research on SMEs. 7th International Conference on Environment and Industrial Innovation. IOP Publishing. doi:10.1088/1755-1315/67/1/012006 [Google Scholar] [Crossref]
14. Izatul Laili, J., Faridah, I., Abdul Rashid, A. A., & Nur Mardhiyah, A. (2014). Industrialized Building System Projects: A Survey of Construction Project Manager's Competencies in Malaysia. Australian Journal of Basic and Applied Sciences, 8(2), 294-300. [Google Scholar] [Crossref]
15. Jabar, I., Abdul-Aziz, A., Suresh, S., Renukappa, S., & Enshassi, A. (2019). A Project Management Competency Framework for Industrialised Building System (IBS) Construction. International Journal of Technology, 10(4), 657-666. doi:https://doi.org/10.14716/ijtech.v10i4.2773 [Google Scholar] [Crossref]
16. Khor, S.-C., Tiang, W.-Y., Abdullatef, O. A., & Wai, S.-H. (2021). Appraisal on Workforce Performance towards Industrialised Building System in Perak, Malaysia. Environment-Behaviour Proceedings Journal, 6(18), 49-53. doi:10.21834/ebpj.v6i18.3066 [Google Scholar] [Crossref]
17. Lim, J. G., Selvanathan, A., & Ilham, S. (2016). Developing A Framework For Enhancing Project Performances Through The Adoption Of The Industrialized Building System In The Malaysian Construction Sector. The International Journal of Social Sciences and Humanities Invention, 3(9), 2538-2548. doi: 10.18535/ijsshi/v3i9.1 [Google Scholar] [Crossref]
18. Lou, E. C., & Kamar, K. A. (2012). Industrialized Building Systems: Strategic Outlook for Manufactured Construction in Malaysia. Journal of Architectural Engineering, 18(2). doi:10.1061/(ASCE)AE.1943-5568.0000072 [Google Scholar] [Crossref]
19. Massofia, M. A., Nor Haslinda, A., Haryanti, M. A., & Nor Ain, A. (2018). Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia. International Journal of Engineering & Technology, 7(4), 2209-2212. doi:10.14419/ijet.v7i4.17863 [Google Scholar] [Crossref]
20. Md. Ali, M., Abas, N. H., Mohd Affandi, H., & Abas, N. A. (2018). Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia. nternational Journal of Engineering & Technology, 7(4), 2209-2212. doi:10.14419/ijet.v7i4.17863 [Google Scholar] [Crossref]
21. Mohammad Shamsudin, N. A. (2021). Perceptions of critical success factors in the management of dilapidated schools’ reconstruction projects using Industrialised Building System method in rural areas in Sarawak. Retrieved from https://eprints.nottingham.ac.uk/65097/ [Google Scholar] [Crossref]
22. Mohammed, A. (2016). Enhancing skill worker requirements in improving implementation of IBS in construction projects. Retrieved from https://www.semanticscholar.org/paper/Enhancing-skill-worker-requirements-in-improving-of-Mohammed/40109adb60fa120ed2ace6b573353099920a4be2 [Google Scholar] [Crossref]
23. N.W.M., W., M. A., A., M. K. F., O., N. A., H., S. N. S., S., & M. F., M. (2016). The Insight of Industrialised Building System (IBS) By Bumiputera Construction Players. MATEC Web of Conferences. doi:https://doi.org/10.1051/MATECCONF/20164704013 [Google Scholar] [Crossref]
24. Nasir, S., Alisibramulisi, A., Abdullah, W. Z., Jaafar, N., & Zulkifli, A. M. (2021). Industrialised building system workmanship performance in Malaysia. 1ST INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING EDUCATION (ICCEE 2021). Volume 2489, Issue 1. AIP Publishing LLC. Retrieved from https://doi.org/10.1063/5.0094101 [Google Scholar] [Crossref]
25. Rashidi, A., & Ibrahim, R. (2017). Industrialized Construction Chronology: The Disputes and Success Factors for a Resilient Construction Industry in Malaysia. The Open Construction and Building Technology Journal, 2017, 11, 286-300, 286-300. Retrieved from https://doi.org/10.2174/1874836801711010286 [Google Scholar] [Crossref]
26. Ruzki, R. M. (14 Februari, 2023). 830 sekolah seluruh negara ada bangunan daif, tak selamat. Putrajaya, Malaysia. Retrieved from https://www.bharian.com.my/berita/nasional/2023/02/1063971/830-sekolah-seluruh-negara-ada-bangunan-daif-tak-selamat [Google Scholar] [Crossref]
27. Sing Wong, S., & Kung Lau, L. (2015). Advantages and Setbacks of Industrialized Building System (IBS) Implementation: A Case Study in Sarawak. International Journal of Sustainable Construction Engineering and Technology, 6(1), 52-61. Retrieved from https://publisher.uthm.edu.my/ojs/index.php/IJSCET/article/view/1110 [Google Scholar] [Crossref]
28. Tazifuzin, A., & Dani, S. (2024). A REVIEW ON TVET CURRICULUM PRACTICES IN MALAYSIA . INTERNATIONAL JOURNAL OF EDUCATION, PSYCHOLOGY AND COUNSELLING (IJEPC), 6(40). Retrieved from https://gaexcellence.com/ijepc/article/view/3267 [Google Scholar] [Crossref]
29. Wan Ahmad, W. F. (2025). Bridging the Divide: An Analysis of Community-Led Approaches in Sabah & Sarawak, Malaysia Rural Infrastructure Development. International Journal of Latest Technology in Engineering Management & Applied Science, 14(11), 212-235. doi:10.51583/IJLTEMAS.2025.1411000022 [Google Scholar] [Crossref]
30. Wan Ahmad, W. F. (2025a). The Impact of School Infrastructure on Student Academic Performance in Sarawak, Malaysia: A Review. The International Journal of Research and Scientific Innovation, 12(10), 2691-2720. Retrieved from https://doi.org/10.51244/IJRSI.2025.1210000230. [Google Scholar] [Crossref]
31. Wan Ahmad, W. F. (2025b). Analysis of Delay Factors in Rural Development Projects Utilizing the Industrialized Building System (IBS) in Malaysia: A Review. International Journal For Multidisciplinary Research, 7(5). Retrieved from https://doi.org/10.36948/ijfmr.2025.v07i05.58415 [Google Scholar] [Crossref]
32. Wan Ahmad, W. F. (2026). Workforce Skill Challenges in IBS Project Implementation in Rural Area Sabah & Sarawak: A Systematic Analysis. International Journal of Research and Innovation in Applied Science (IJRIAS), 10(12). doi:10.51584/IJRIAS.2025.10120041 [Google Scholar] [Crossref]
Metrics
Views & Downloads
Similar Articles
- Performance Analysis of Silicon PV Array Using Infrared Thermography and Detecting Temperature Non-Uniformities
- Dynamic Capabilities and Digital Transformation Performance: The Role of Organizational Agility in the Public Sector
- Comparative Effectiveness of Neural Mobilization Versus Positional Release Technique in Cervical Radiculopathy – An Experimental Study
- Soil Moisture Mapping of Solano Nueva Vizcaya: A Comparison and Review
- Silent Assistance for Emergencies (SAFE): A Mobile-Based Emergency Reporting Application for the Deaf and Mute Community