[1]
2026. Evaluation of Traffic Load Variation in Onitsha Following the Construction of the Atani–Obosi Access Route of the Second Niger Bridge, Nigeria. International Journal of Latest Technology in Engineering Management & Applied Science. 15, 6 (Jul. 2026), 1621–1635. DOI:https://doi.org/10.51583/IJLTEMAS.2026.150600112.