“Evaluation of Traffic Load Variation in Onitsha Following the Construction of the Atani–Obosi Access Route of the Second Niger Bridge, Nigeria” (2026) International Journal of Latest Technology in Engineering Management & Applied Science, 15(6), pp. 1621–1635. doi:10.51583/IJLTEMAS.2026.150600112.