[1]
“Temporary Transformer Room Installations for Construction Sites: Cable Sizing, Testing, WR2, and Circuit Breaker Discrimination”, IJLTEMAS, vol. 15, no. 4, pp. 874–890, May 2026, doi: 10.51583/IJLTEMAS.2026.150400079.