[1]
“Evaluation of Traffic Load Variation in Onitsha Following the Construction of the Atani–Obosi Access Route of the Second Niger Bridge, Nigeria”, IJLTEMAS, vol. 15, no. 6, pp. 1621–1635, Jul. 2026, doi: 10.51583/IJLTEMAS.2026.150600112.